Tear down of the old Feed Lot took place in January 2006.

Construction Updates:

Planned location is immediately adjacent to the existing Beef Cattle Evaluation Center (BCEC), resulting in a double capacity of uniform pens to conduct applies research and specialized feed trials.

The design was finalized in June and the project will go to bid in 2007 when sufficient funding becomes available.

 

Feed Lot

Line drawing for the new Feed Lot facility, set to go to bid in 2007.